# DEV-PLAN-04 assessor guide **Assessor-only. Version 1.0.** [Public packet](../public/DEV-PLAN-04-screening-programme.md). Hand-authored programme feasibility key, not a participant answer or executed event. Apply [common conventions](README.md). | Criterion | Public requirement | Supported answer or acceptable alternative | Public support | |---|---|---|---| | C1 | R1 | Within 850 words and requested list, table, totals, swap, uncertainty. | Public R1 | | C2 | R2 | A, B, D, E form a feasible four-film selection; assess any other proposed selection directly against all public constraints. No excerpts or repeats. | S1-S2; S4:L1 | | C3 | R3 | In that selection A is local, E science-themed, B and D captioned. No unsupported attribute inheritance. | S1:L1-L2; S2:L2-L3 | | C4 | R4 | 20 + 15 + 10 + 35 = USD 80; USD 10 remains under 90. | S1-S2; S4:L2 | | C5 | R5 | All intervals within 18:00–21:00, no simultaneous film. | S3:L1 | | C6 | R6 | Three separate five-minute turnovers = 15 minutes. | S3:L2 | | C7 | R7 | Additional 15-minute break between films 2 and 3, not merged with turnover. | S3:L2 | | C8 | R8 | Film 145 + turnover 15 + break 15 = 175 minutes, leaving 5 of 180. | S1-S3 | | C9 | R9 | Any consistent order accepted; durations and break position preserved. | S3:L1-L2; S4:L1 | | C10 | R10 | E→C gives 150 film minutes and 180 programme minutes; timing fits exactly and attributes fit, but USD 95 exceeds budget by USD 5. | S1-S2; S3; S4:L2; S5:L1 | | C11 | R11 | Quote/availability distinct from secured rights or actual attendance; no completed outcome. | S5:L2 | | C12 | R12 | Public locations and derived inputs cited; no invented cost or staff/venue resource. | Public R12; S1-S5 | ## Direct feasibility witness and arithmetic One valid reference ordering is A 18:00–18:40; turnover 18:40–18:45; B 18:45–19:20; break 19:20–19:35; turnover 19:35–19:40; D 19:40–20:05; turnover 20:05–20:10; E 20:10–20:55. It has the required quotas and leaves five minutes. Other valid orders are accepted, with the break relocated to their second/third-film gap. This witness is not an executed programme or a hidden ordering criterion. Film time is 40 + 35 + 25 + 45 = 145. Rights cost is 80. Replacing E's 45 minutes/USD 35 with C's 50 minutes/USD 50 adds five minutes and USD 15: total time 180 and cost 95. Thus a swap can be time-feasible and satisfy attributes while failing the monetary ceiling. No estimate of audience preference or actual rights availability is needed to complete the task, and neither an optimality proof nor a film-quality ranking is required.