# DEV-PLAN-01: Pineglass exhibit dispatch plan **Family:** structured planning and analysis. **Version:** 1.0, immutable. **Provenance:** hand-authored fictional resource sheet, timings, people, quantities, and prices; not measured productivity or actual shipments. All IDs below are local to DEV-PLAN-01. ## Immutable assignment Produce a feasible text plan for packing and verifying three lots of exhibit kits on one fictional working morning. Use only S1–S5. Show an operation schedule, stock ledger, and cost breakdown whose prose and tables agree. Any feasible schedule is acceptable; there is no requirement to find the earliest finish. Do not execute tasks, simulate agent performance, write code, or claim that a shipment has happened. ## Public requirements - **R1:** Use at most 850 words and include a schedule table, a stock-ledger table, a cost breakdown, and a short assumptions/uncertainties paragraph. Count whitespace-separated words throughout, excluding punctuation-only table separators. - **R2:** Schedule all six operations: assembly and verification for each of A, B, and C, using the given whole-lot durations. Each lot's verification must follow its completed assembly; operations cannot be split or shortened. - **R3:** Both crew members must attend each operation. They cannot work on two operations at once. Verification additionally requires the separate verifier during her available windows; assembly does not require her. - **R4:** Keep every operation within 09:00–12:00 and outside the mandatory 10:30–10:45 crew break. State all start and finish times in the supplied local clock convention. - **R5:** Finish each lot's verification no later than its pickup time. Treat the stated pickups as fixed and do not change them to rescue an infeasible plan. - **R6:** Show stock before/after assembly consumption and the receipt event so that no item is consumed before arrival and no balance is negative. Assembly consumes the whole lot's materials at its start. - **R7:** Give the final remaining balance for each material and the total number of kits ready for dispatch. Count each kit only once. - **R8:** Calculate material cost from quantities consumed and the supplied USD unit prices; do not charge all opening stock or unused stock. - **R9:** Calculate crew labor and verifier labor separately using productive operation time only. Do not charge crew waiting/break time or verifier assembly time. - **R10:** Show direct subtotal, 10% contingency, total including contingency, and headroom against USD 160. Add no courier charge or unstated expense. State whether the proposed plan fits the ceiling. - **R11:** State that receipt timing and operation durations are planning assumptions, that delayed stock could invalidate the plan, and that the schedule is proposed rather than executed. No numerical probability or invented contingency resource is required. - **R12:** Cite source IDs and line locations for constraints and calculation inputs. Keep schedule, stock, costs, and prose consistent, using only S1–S5. Do not claim a unique or optimal schedule. ## Complete authorized source packet ### S1 — Lots, durations, and pickup deadlines - **L1:** Lot A contains 4 kits. Whole-lot assembly takes 30 minutes; whole-lot verification takes 15 minutes. Fixed pickup is 10:00. - **L2:** Lot B contains 3 kits. Whole-lot assembly takes 45 minutes; whole-lot verification takes 15 minutes. Fixed pickup is 11:45. - **L3:** Lot C contains 5 kits. Whole-lot assembly takes 30 minutes; whole-lot verification takes 15 minutes. Fixed pickup is 12:00. - **L4:** Verification follows assembly of the same lot. Each operation is indivisible. Durations are per lot, not per kit. Completion exactly at a pickup time is allowed; no additional loading or travel operation is required. Pickups consume no crew/verifier time. ### S2 — People, working time, and time convention - **L1:** Ari and Bo form one two-person crew. Both must attend every assembly and verification operation. They are available 09:00–12:00, except for a mandatory break from 10:30 to 10:45. No operation may overlap that break. There is no other crew. - **L2:** Cora is a separate verifier, additional to Ari and Bo. She must attend every verification operation and is available only 09:00–10:00 and 11:00–12:00. Assembly does not need Cora. She cannot verify two lots simultaneously. - **L3:** All times are on the same fictional day and local clock. Intervals are start-inclusive and end-exclusive: one operation may start exactly when another ends. Stock arriving at 10:45 is usable for an operation starting at 10:45. ### S3 — Materials and stock - **L1:** Each kit consumes 1 carton, 2 padding units, and 1 label. Consume all of a lot's required materials at the start of that lot's assembly; there is no scrap or reuse. - **L2:** At 09:00 opening stock is 9 cartons, 22 padding units, and 14 labels. - **L3:** A fixed planned receipt at 10:45 adds 3 cartons and 4 padding units, with no labels. These are the only additional materials. For planning, assume this receipt is on time; there is no alternative supplier or emergency stock. - **L4:** Staging capacity is sufficient for all three finished lots. It creates no additional resource constraint or cost. ### S4 — Cost rules - **L1:** Material rates are USD 1.50 per carton, USD 0.40 per padding unit, and USD 0.20 per label. Charge only materials consumed by the kits, regardless of whether the units came from opening stock or the receipt. - **L2:** Each crew member costs USD 18 per productive hour. Both are charged for all assembly and verification durations; waiting and the break are uncharged. Cora costs USD 28 per productive hour of verification only, in addition to the crew cost. - **L3:** Direct cost is consumed materials plus productive crew and verifier labor. Add a contingency equal to 10% of this direct subtotal, rounded to two decimal places. The ceiling including contingency is USD 160. Courier costs are already prepaid and excluded; there are no other charges. ### S5 — Status and uncertainty - **L1:** All durations and the 10:45 receipt are planning assumptions, not observations of a completed morning. Actual receipt delays or longer operations could make a plan fail; no probabilities, spare staff, overtime, or extra purchasing authority are supplied. - **L2:** No earliest-finish objective is imposed. Any schedule satisfying the listed deadlines, inventory availability, dependencies, and staffing rules is acceptable.