# DEV-CON-01: Morrow equipment-lending procedure **Family:** constraint-heavy documents. **Version:** 1.0, immutable. **Provenance:** hand-authored fictional internal policy, people, inventory, and tickets; not real institutional rules or observed cases. All IDs below are local to DEV-CON-01. ## Immutable assignment Write a usable operating procedure for the fictional Morrow exhibition-equipment depot. Resolve the old memo against the current directive, specify roles and handoffs, and explain normal and exception paths using only S1–S5. Include short prospective handling traces for the four supplied tickets. The traces are explanations of what staff should do, not claims that actions have occurred. Produce text only; do not implement a system or add policies from outside the packet. ## Public requirements - **R1:** Use at most 950 words and five sections titled Scope, Roles, Normal flow, Exceptions, and Data. Include all four ticket traces in Exceptions. Count whitespace-separated words in headings, prose, tables, and citations, excluding punctuation-only table separators. - **R2:** Assign intake/communication to the desk coordinator, physical availability/handover/inspection to the custodian, and only the stated repair-release and extension decisions to the supervisor. Do not let one role silently grant another role's authority. - **R3:** Apply the current limit of two kits for three inclusive calendar days; explicitly reject the old memo's four-kit/five-day allowance. Keep lending free with no deposits, payments, or identity-document collection. - **R4:** Reserve only after the custodian confirms a physically available kit and acknowledges allocation. Exclude already issued, reserved, or quarantined kits from availability; waiting requests are not promises or reservations. - **R5:** Specify the normal status sequence and the two authorized pre-issue cancellation paths in S2. Use only the listed statuses; explain any waiting/overdue flags without inventing a new status. - **R6:** Require a recorded physical return, then custodian inspection before a returned issued kit can close and become available. Include the custodian's acknowledgment as the handoff evidence. - **R7:** For damage, quarantine under Hold; require supervisor repair-release authorization followed by custodian reinspection before closure. Do not skip inspection or promise a replacement from unavailable stock. - **R8:** Keep an overdue unreturned kit Issued with an overdue flag; notify the borrower and custodian without adding a fee, automatic closure, or presumed return. - **R9:** Allow an extension only under the supervisor's one-day/no-conflicting-reservation rule and record the individual decision. An individual exception does not change the standing policy. - **R10:** Give a packet-consistent prospective response for each of Q1–Q4, identifying the status or unchanged status, responsible role, and required next handoff or decision. Do not invent completed actions. - **R11:** Specify the exact minimum ticket fields and retention rule in S3. Keep active records until closure and remove identifying contact details seven days after closure; do not expand data collection. - **R12:** Cite source IDs and line locations for operative rules and ticket handling. Introduce no new eligibility rules, fees, approval requirements, powers, or completed-outcome claims beyond S1–S5. ## Complete authorized source packet ### S1 — Current directive and superseded memo - **L1:** Current directive D2 overrides old memo D1 wherever they differ. D2 permits at most two kits per borrower for three calendar days inclusive of pickup day. A pickup on day 1 is normally due by the depot's close on day 3. - **L2:** D1 formerly permitted four kits for five days. That allowance is obsolete and must not appear as an available option. - **L3:** Lending is free. Do not collect deposits, payment information, identity documents, or identity-document copies. There are no additional eligibility rules in this packet. - **L4:** The depot owns six distinct kits. A kit is unavailable while reserved, issued, or quarantined under Hold. Different status labels on a ticket must not double-count the same physical kit. ### S2 — Roles, states, and handoffs - **L1:** The desk coordinator records requests and communicates decisions. The custodian alone confirms physical availability, acknowledges allocation, hands over kits, and records inspection. The supervisor has only the exception powers stated in S4 and repair-release authority stated here. - **L2:** The normal ticket sequence is Requested → Reserved → Issued → ReturnPending → Closed. Requested → Reserved requires the custodian's allocation acknowledgment; Reserved → Issued requires the custodian's recorded handover. A waiting request remains Requested, without a promise of availability. - **L3:** A desk-recorded physical return moves Issued → ReturnPending and prompts a handoff to the custodian. Only the custodian's recorded inspection acknowledgment permits ReturnPending → Closed and restoration to available stock. - **L4:** If inspection finds damage, the custodian changes ReturnPending → Hold and quarantines the kit. After repair, the supervisor may authorize Hold → ReturnPending; the custodian must then reinspect before closure. This authorization does not itself make the kit available. - **L5:** A borrower withdrawal before allocation allows the coordinator to record Requested → Closed. A cancellation before handover allows Reserved → Closed only after the custodian acknowledges release of the allocation. These never-issued cancellations do not require return inspection. - **L6:** Requested, Reserved, Issued, ReturnPending, Closed, and Hold are the only statuses. A waiting flag or overdue flag is metadata, not a new status. Transition/handoff evidence is a role name, timestamp, and recorded acknowledgment on the ticket. ### S3 — Minimum record and retention - **L1:** The minimum ticket fields are ticket ID, borrower-chosen name or alias, one contact route, kit IDs when allocated, pickup and due dates when allocated, status, applicable flags, and the event log. The event log records transitions, role names, timestamps, acknowledgments, and any extension or repair-release decision with its reason. - **L2:** Keep the active ticket until it closes. Seven days after closure, remove the borrower name/alias and contact route; retain only the non-identifying operational fields. Do not collect additional personal fields. ### S4 — Overdue and extension rules - **L1:** If the due time passes without physical return, the coordinator marks the Issued ticket overdue and notifies the borrower and custodian. The kit remains unavailable; it is not automatically returned or closed. No overdue fee is authorized. - **L2:** Before the current due time, the supervisor may approve at most one additional calendar day for an individual ticket only if it conflicts with no later reservation for that kit. Record approval or denial, reason, supervisor, timestamp, and any revised due date. A conflicting reservation requires denial. No other extension power or standing-policy change is authorized. ### S5 — Tickets requiring explanation - **L1:** Q1 is a new request for one kit. The custodian's current count is four distinct kits Issued, one Reserved, and one in Hold. No kit has been physically returned or released. - **L2:** Q2 has reached ReturnPending after a physical return. The custodian's inspection identifies damage. No repair or supervisor release has yet been recorded. - **L3:** Q3 remains Issued. Its due time passed this morning, and there is no physical return record. - **L4:** Q4 is an Issued ticket whose current due time has not passed. The borrower requests one extra day, but the custodian confirms a later reservation for the same kit during that requested day. No extension decision is recorded.