# DEV-PLAN-04: Oriole short-film screening programme **Family:** structured planning and analysis. **Version:** 1.0, immutable. **Provenance:** hand-authored fictional films, durations, rights quotes, and venue rules; not actual contracts, audiences, or screening results. IDs are local to this task. ## Immutable assignment Select four films and propose a complete evening programme within the supplied time and rights-budget constraints. Include the required break and separate turnover intervals. Explain the requested swap comparison using only S1–S5. Produce text, not a booking, payment, or screening claim. ## Public requirements - **R1:** Use at most 850 words with selected-film list, timed programme table, cost/time totals, swap assessment, and uncertainty note. Count whitespace-separated words throughout, excluding punctuation-only table separators. - **R2:** Select exactly four distinct films from A–E, screening each once and at its full supplied duration; no excerpts or extra films. - **R3:** Include at least one locally made film, at least one science-themed film, and at least two captioned films according to the supplied attributes; one film may meet multiple attributes. - **R4:** Sum the four quoted rights fees, keep within USD 90, and report remaining budget without inventing discounts or additional funds. - **R5:** Keep the programme within 18:00–21:00, using the stated clock convention and no concurrent screenings. - **R6:** Include a separate five-minute turnover between consecutive films: exactly three for four films, with none required before the first or after the last. - **R7:** Put a 15-minute audience break between the second and third films, in addition to their turnover; do not overlap the break with film or turnover time. - **R8:** Report total film minutes, turnover minutes, break minutes, total occupied programme time, and spare minutes in the venue window. - **R9:** Make all table times consistent with durations and the stated break/turnover rules. Any otherwise valid film order is acceptable; no earliest-finish or unique-order claim is required. - **R10:** Assess the specific swap replacing E with C in the selection A, B, D, E: calculate new programme duration and rights cost, and say which constraints permit or reject it. - **R11:** Distinguish quoted rights and planned availability from secured permissions or actual attendance; claim no screening or audience benefit has occurred. - **R12:** Cite source IDs and line locations for attributes, constraints, and arithmetic inputs; use only S1–S5 and no unlisted staffing or financial assumptions. ## Complete authorized source packet ### S1 — Films A and B - **L1:** A, “Window Lines”: 40 minutes, locally made, not science-themed, not captioned. Quoted rights fee USD 20. - **L2:** B, “Paper Sky”: 35 minutes, not locally made, not science-themed, captioned. Quoted rights fee USD 15. ### S2 — Films C, D, and E - **L1:** C, “Signal Garden”: 50 minutes, locally made, science-themed, captioned. Quoted rights fee USD 50. - **L2:** D, “Quiet Tracks”: 25 minutes, not locally made, not science-themed, captioned. Quoted rights fee USD 10. - **L3:** E, “Small Orbits”: 45 minutes, not locally made, science-themed, not captioned. Quoted rights fee USD 35. ### S3 — Venue timing - **L1:** The fictional same-day venue window is 18:00–21:00, 180 minutes. One film runs at a time; intervals are start-inclusive/end-exclusive and adjacent intervals may share endpoints. Film durations include introductions; no other introduction time is needed. - **L2:** Allow five minutes of turnover between each consecutive pair of films, but none before the first or after the last. A 15-minute audience break must fall between the second and third films in addition to that pair's turnover. Break and turnover can occur in either order but cannot overlap. No other breaks or loading time are required. ### S4 — Selection and cost scope - **L1:** The director requests four distinct films, at least one local, at least one science-themed, and at least two captioned. Any order satisfying timing is acceptable. - **L2:** Rights budget is USD 90. The quoted fees are the only programme costs being compared; venue and projection staff are prepaid and supplied for the whole window. No discounts, simultaneous screen, alternative cuts, or further funds are authorized. ### S5 — Comparison and uncertainty - **L1:** For the requested swap comparison, start from A, B, D, E and replace E with C while retaining four films and the same break/turnover rules. - **L2:** All rights figures are fictional quotes and availability is a planning assumption, not secured permission. No audience, completed screening, or benefit measurements exist in this packet.